Loading...
KODIAK INN BK 19 LT 14 AND KODIAK TWNST BK 19 LT 11A 7 13 - ZCP 4/30/2013Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form I Submit by Email 1111111111111111111 23670 Permit No. CZ2013 -078 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: John Johnson 236 Rezanof Dr. W, Kodiak, AK. 99615 (907) 486 -5712 info @kodiakinn.com Subdv: Kodiak Inn 236 Rezanof Dr. W. Block: 19 Lot: 14 Hotel, Hospitality Description of Proposed Action: Re -roof front bld'g (^'13,000sgft) Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Business KIBC 17.90 PROP_ID 23670 Lot Area: 40,413 Lot Width: Not Applicable Bldg Height: 50' Front Yard: Rear Yard: Side Yard: Prk'g Plan Rvw? No # of Req'd Spaces: Staff Compliance Review Notes: Plat / Subdivision Requirements? Subd Case No. Plat No. Bldg Permit No. Does the project involve an EPA defined facility? Driveway Permit? Septic Plan Approval: Fire Marshall: NO If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Date: Apr 30, 2013 List Other: Signature: Susan Johnson (forJohn Johnson) This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of780days. Before such work can be recommenced, anew permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.75.060A.** CDD Staff Certification Date: Apr 30, 2013 CDD Staff. Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building PAID APR 3 0 2013 KODIAK ISLAND BOROUGH Not AppliFMANGE DEPARTMENTr $0.00 Less than 1.75 acres: r $30.00 1.76 to 5.00 acres: r $60.00 5.01 to 40.00 acres: F $90.00 40.01 acres or more: F- $120.00 Aker - the -Fact 2X the published amount F $0.00 F- $60.00 F- $120.00 F $180.00 F- $240.00