KODIAK INN BK 19 LT 14 AND KODIAK TWNST BK 19 LT 11A 7 13 - ZCP 4/30/2013Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form I
Submit by Email
1111111111111111111
23670
Permit No. CZ2013 -078
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
John Johnson
236 Rezanof Dr. W, Kodiak, AK. 99615
(907) 486 -5712
info @kodiakinn.com
Subdv: Kodiak Inn
236 Rezanof Dr. W.
Block: 19 Lot: 14
Hotel, Hospitality
Description of Proposed Action: Re -roof front bld'g (^'13,000sgft)
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review:
Current Zoning: Business KIBC 17.90 PROP_ID 23670
Lot Area: 40,413 Lot Width: Not Applicable Bldg Height: 50'
Front Yard: Rear Yard: Side Yard:
Prk'g Plan Rvw? No # of Req'd Spaces:
Staff Compliance Review Notes:
Plat / Subdivision Requirements?
Subd Case No.
Plat No. Bldg Permit No.
Does the project involve
an EPA defined facility?
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
NO If YES, do you have an EPA Return Receipt of
Notification?
"Permit will not be issued until receipt is submitted to
KIB"
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date: Apr 30, 2013
List Other:
Signature: Susan Johnson (forJohn Johnson)
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of780days. Before such work can be recommenced, anew permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.75.060A.**
CDD Staff Certification
Date: Apr 30, 2013 CDD Staff. Martin
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
PAID
APR 3 0 2013
KODIAK ISLAND BOROUGH
Not AppliFMANGE DEPARTMENTr $0.00
Less than 1.75 acres:
r
$30.00
1.76 to 5.00 acres:
r
$60.00
5.01 to 40.00 acres:
F
$90.00
40.01 acres or more:
F-
$120.00
Aker - the -Fact 2X the published amount
F $0.00
F- $60.00
F- $120.00
F $180.00
F- $240.00