Loading...
AIRPARK BK 1 LT 6 - ZCP 3/1/2013Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form In IIIIIIflhII I 14232 Submit by Email Permit No. CZ2013 -069 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: The following information is to be supplied by the Applicant: Lucas Smith 1815 Mill Bay Rd., Kodiak, AK. 99615 907 - 486 -2746 Isconstruction @gci.net Subdv: Airpark Street Address: 1811 Mill Bay Road Use & Size of Existing Structures: Block: 1 Lot: 6 Ground floor office and upper story residential 1,900 Sq. Ft Description of Proposed Action: Convert office space to residential and construct new dwelling unit in rear yard connected by a breezeway at least eight feet in width in order to convert use to multi - family residential. Includes required improvements to parking areas in order to meet the circulation and number of space requirement for tri -plex use. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Business KIBC 17.90 PROP_ID 14232 Lot Area: 8,632 Sq. Ft. Lot Width: Not Applicable Bld'g Height: Not Applicable Front Yard: Not Applicable Rear Yard: Not Applicable Side Yard: Not Applicable Prk'g Plan Rvw? Yes # of Req'd Spaces: 6 Plat / Subdivision Requirements? Does the project involve an EPA defined facility? MFR requires turning and manuevering on site. One way access drive relies on mutual access w/ adj. lot. If YES, do you have an EPA Return Receipt of Notification? N / A "Permit will not be issued until receipt is submitted to KlB" N / A Subd Case No. NA Plat No. NA Bld'g Permit No. Pending Driveway NA Permit? Septic Plan NA Approval: Fire NA Marshall: Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Mar 1, 2013 List Other: Signature: Lucas Smith This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBQ per KIBC 17.15.060 A. ** CDD Staff Certification Date: Mar 1, 2013 CDD Staff: Duane Dvorak Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After - the -Fact 2X the published amount Not Applicable F $0.00 �7P 33 r $0.00 Less than 1.75 acres: r $30.00 P AID Y� r $60.00 1.76 to 5.00 acres: �.�$60.00 r $120.00 5.01 to 40.00 acres: F $90.00 MAR 0 12013 r $180.00 40.01 acres or more: F $120.000 $240.00 Knoll, � cin _ � i � � i � i - _ __... , _.