Loading...
BARANOF HGTS 1ST BK 7 LT 17 - ZCP 2/4/2013Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form Submit by Email 111 II 11111011 IU 14830 Permit No. CZ2013 -059 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Scott M Pillans P.O. Box 3132 Kodiak, AK 99615 907 - 486 -5405 scottpillans @yahoo.com Subdv: Baranof Heights 1311 Larch Street Block: 7 Lot: 17 Single- family Residential, 3,000 Sq. Ft. Description of Proposed Action: Conversion of existing Single- family Residential into a duplex (upper and lower units with 1,500 Sq. Ft. per unit per floor). Complete remodel of the interior, reframing, plumbing, heating, and electrical work within the interior of the dwellings. Site Pia n to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R2 KIBC 17.80 PROP_ID 14830 Lot Area: 8,326 Sq. Ft. Lot Width: 60' BId'g Height: 35 ' Front Yard: 25 ' Rear Yard: 10 ' Side Yard: 5 ' Prk'g Plan Rvw? Yes # of Req'd Spaces: 6 Plat / Subdivision Requirements? Does the project involve an EPA defined facility? 10 foot utility easement on the rear property line. If YES, do you have an EPA Return Receipt of Notification? N / A "Permit will not be issued until receipt is submitted to KIB" N / A Subd Case No. NA Plat No. NA Bld'g Permit No. Pending Driveway Permit? Septic Plan Approval: Fire Marshall: Pending NA NA Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Feb 4, 2013 List Other: Signature: Scott M. Pillans This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** A CDD Staff Certification Date: Feb 4, 2013 CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building Not Applicable $0.00 DA - $0.00 Less than 1.75 acres: r" $30.00 S f el , r $60.00 1.76 to 5.00 acres: r $60.00 Eg 0 4 2013 r $120.00 5.01 to 40.00 acres: r $90.00 5180.00 0 11 )IUrIJry 40.01 acres or more: r $120.00 - +$240.00 Cln =t 1 iQl 1 Pn+ 11Y Aftgr 2X the published amount X9,97 , - O Q 3 s °s S6r q+ 30] FO T • • s � • CL � � 4 a Q vh / Na+ A � C•� �T / eJ �./ • N � �� �� R^n \�� /� Z Z \Cv� \\ •.Y` v \ \ A L l \ I /\ \ a• v f \� 3 G, J V 1i , P: �e 1' �! ,a