Loading...
BELLS FLATS BK 3 LT 4C - ZCP 1/18/2011Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 11 11 11 11 1 22269 1 Submit by Email 111 Permit No. BZ2011 -002 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: The following information is to be supplied by the Applicant: Eli Rodgers P.O. Box 5582, Chiniak Alaska 99615 907 - 486 -0233 Bells Flats Block 3, Lot 4C 908 Sargent Creek Road Use & Size of Existing Structures: Vacant Description of Proposed Action: Construct 28 by 56 foot single -story single - family residential dwelling with 16 by 20 foot attached garage. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: ZONING: RR -1 Prop_ID 22269 Lot Area: 66,741 Sq. Ft. Lot Width: 120' Bld'g Height: 35 ' Front Yard: 25' Rear Yard: 20' Side Yard: 15' Prk'g Plan Rvw? Yes # of Req'd Spaces: 3 Plat / Subdivision Requirements? Does the project involve an EPA defined facility? 10' utility easement on the west side lot line. N/A If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" N/A Coastal Policy Residential Subd Case No. NA Driveway Permit? Pending Septic Plan Pending Approval: Fire NA Marshall: Consistent? Yes Attachment? No Plat No. NA Bld'g Permit No. Pending Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Jul 6, 2010 Signature: Eli Rodgers This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Date: Jul 6, 2010 CDD Staff: Duane Dvorak ` Payment Verification Zoning Compliance Permit Fee Payable -in Cashier's Office Room # 104 Fee Schedule than 1.75 acres $30.00 PA si 7, �Iww \11� ZO/ rJ